{"id":16626,"date":"2025-04-02T12:05:34","date_gmt":"2025-04-02T06:35:34","guid":{"rendered":"https:\/\/civileng.helashop.lk\/?page_id=16626"},"modified":"2025-04-02T12:06:30","modified_gmt":"2025-04-02T06:36:30","slug":"ce4030","status":"publish","type":"page","link":"https:\/\/eng.pdn.ac.lk\/civileng\/ce4030\/","title":{"rendered":"CE4030"},"content":{"rendered":"\t\t<div data-elementor-type=\"wp-page\" data-elementor-id=\"16626\" class=\"elementor elementor-16626\" data-elementor-post-type=\"page\">\n\t\t\t\t<div class=\"elementor-element elementor-element-5be75325 e-flex e-con-boxed e-con e-parent\" data-id=\"5be75325\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t\t<div class=\"e-con-inner\">\n\t\t\t\t<div class=\"elementor-element elementor-element-725c2c97 elementor-widget elementor-widget-html\" data-id=\"725c2c97\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"html.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t<style>\r\n    table {\r\n        border: 1px solid black;\r\n        font-family: Verdana;\r\n        font-size: 12pt;\r\n        border-collapse: collapse;\r\n        width: 100%;\r\n    }\r\n    td, th {\r\n        border: 1px solid black;\r\n        padding: 5px;\r\n        text-align: left;\r\n    }\r\n    @media screen and (max-width: 600px) {\r\n        table {\r\n            display: block;\r\n            overflow-x: auto;\r\n            white-space: nowrap;\r\n        }\r\n    }\r\n<\/style>\r\n<table>\r\n<tbody style=\"vertical-align: top; overflow: visible;\">\r\n\r\n<tr>\r\n<td width=\"267\">\r\n<p><strong>Semester:<\/strong><\/p>\r\n<\/td>\r\n<td colspan=\"8\" width=\"596\">\r\n<p>7<\/p>\r\n<\/td>\r\n<\/tr>\r\n<tr>\r\n<td width=\"267\">\r\n<p><strong>Course Code<\/strong>:<\/p>\r\n<\/td>\r\n<td colspan=\"8\" width=\"596\">\r\n<p>CE4030<\/p>\r\n<\/td>\r\n<\/tr>\r\n<tr>\r\n<td width=\"267\">\r\n<p><strong>Course Name<\/strong>:<\/p>\r\n<\/td>\r\n<td colspan=\"8\" width=\"596\">\r\n<p>Construction Management<\/p>\r\n<\/td>\r\n<\/tr>\r\n<tr>\r\n<td width=\"267\">\r\n<p><strong>Credit Value:<\/strong><\/p>\r\n<\/td>\r\n<td colspan=\"8\" width=\"596\">\r\n<p>2 (Notional hours:100)<\/p>\r\n<\/td>\r\n<\/tr>\r\n<tr>\r\n<td width=\"267\">\r\n<p><strong>Prerequisites:<\/strong><\/p>\r\n<\/td>\r\n<td colspan=\"8\" width=\"596\">\r\n<p>None<\/p>\r\n<\/td>\r\n<\/tr>\r\n<tr>\r\n<td width=\"267\">\r\n<p><strong>Core\/Optional<\/strong><\/p>\r\n<\/td>\r\n<td colspan=\"8\" width=\"596\">\r\n<p>Core<\/p>\r\n<\/td>\r\n<\/tr>\r\n<tr>\r\n<td rowspan=\"2\" width=\"267\">\r\n<p><strong>Hourly Breakdown<\/strong><\/p>\r\n<\/td>\r\n<td colspan=\"2\" width=\"88\">\r\n<p>Lecture hrs.<\/p>\r\n<\/td>\r\n<td width=\"89\">\r\n<p>Tutorial hrs.<\/p>\r\n<\/td>\r\n<td colspan=\"2\" width=\"95\">\r\n<p>Practical hrs.<\/p>\r\n<\/td>\r\n<td width=\"123\">\r\n<p>Assignment hrs.<\/p>\r\n<\/td>\r\n<td colspan=\"2\" width=\"201\">\r\n<p>Independent Learning &amp; Assessment hrs.<\/p>\r\n<\/td>\r\n<\/tr>\r\n<tr>\r\n<td colspan=\"2\" width=\"88\">\r\n<p>26<\/p>\r\n<\/td>\r\n<td width=\"89\">\r\n<p>2<\/p>\r\n<\/td>\r\n<td colspan=\"2\" width=\"95\">\r\n<p>-<\/p>\r\n<\/td>\r\n<td width=\"123\">\r\n<p>4<\/p>\r\n<\/td>\r\n<td colspan=\"2\" width=\"201\">\r\n<p>68<\/p>\r\n<\/td>\r\n<\/tr>\r\n<tr>\r\n<td colspan=\"9\" width=\"864\">\r\n<p><strong>Course Aim: <\/strong>To impart knowledge on project management, sustainability concepts, and legal aspects of the construction industry.<\/p>\r\n\r\n<p><strong>Intended Learning Outcomes<\/strong>:<\/p>\r\n<p>On successful completion of the course, the students should be able to;<\/p>\r\n<p>\u27a2&nbsp;&nbsp;&nbsp; <strong>discuss <\/strong>the functional elements of project management.<\/p>\r\n<p>\u27a2&nbsp;&nbsp;&nbsp; <strong>explain <\/strong>the time, cost, quality, risk management and marketing aspects in the construction industry.<\/p>\r\n<p>\u27a2&nbsp;&nbsp;&nbsp; <strong>demonstrate <\/strong>the applications of sustainability concepts, occupational health, and safety regulations in construction projects<\/p>\r\n<p>\u27a2&nbsp;&nbsp;&nbsp; <strong>engage <\/strong>in the procurement process, bidding and award of civil engineering contracts and<\/p>\r\n<p><strong>demonstrate <\/strong>legal aspects related to the construction industry.<\/p>\r\n<p>\u27a2&nbsp;&nbsp;&nbsp; <strong>discuss <\/strong>the site management aspects and <strong>analyze <\/strong>cash flow related to civil engineering projects.<\/p>\r\n<p>\u27a2&nbsp;&nbsp;&nbsp; <strong>execute <\/strong>selection and acquisition of equipment for construction projects and <strong>estimate<\/strong><\/p>\r\n<p>the ownership and operational costs of construction equipment.<\/p>\r\n<\/td>\r\n<\/tr>\r\n<tr>\r\n<td colspan=\"9\" width=\"864\">\r\n<p><strong>Course Content:<\/strong><\/p>\r\n<p>\u27a2&nbsp;&nbsp;&nbsp; <strong>Project management: <\/strong>Functional elements of project management, project life cycle, cost engineering, value engineering, quality management, construction project management: management of construction projects, risk management.<\/p>\r\n<p>\u27a2&nbsp;&nbsp;&nbsp; <strong>Sustainability in Construction: <\/strong>Construction waste management, recycling, resource efficiency, health and safety in construction, standards, and legal framework for sustainable construction.<\/p>\r\n<p>\u27a2&nbsp;&nbsp;&nbsp; <strong>Industrial law and civil engineering contracts: <\/strong>Acts and laws pertaining to the construction industry in Sri Lanka, disputes and dispute resolution, industrial relations.<\/p>\r\n<p>\u27a2&nbsp;&nbsp;&nbsp; <strong>Procurement: <\/strong>Procurement process, bidding and award of contracts, standard bidding documents (CIDA \/ FIDIC).<\/p>\r\n<p>\u27a2&nbsp;&nbsp;&nbsp; <strong>Site Layout planning &amp; management: <\/strong>Space planning, access to site, office and storage facilities, utility services, site safety and security, fencing and lighting, parking, circulation, and vertical transport; Roles of consultant and contractor at site, documents and records, meetings, progress monitoring and control, site supervision, cash flow management.<\/p>\r\n<p>\u27a2&nbsp;&nbsp;&nbsp; <strong>Introduction to construction equipment management: <\/strong>Types of construction equipment, selection of construction equipment, acquisition options of construction equipment, owning and operating costs of equipment.<\/p>\r\n<\/td>\r\n<\/tr>\r\n<tr>\r\n<td colspan=\"9\" width=\"864\">\r\n<p><strong>Teaching \/Learning Methods:<\/strong><\/p>\r\n<p>Classroom lectures, tutorial discussions<\/p>\r\n<\/td>\r\n<\/tr>\r\n<tr>\r\n<td colspan=\"9\" width=\"864\">\r\n<p><strong>Assessment Strategy:<\/strong><\/p>\r\n<\/td>\r\n<\/tr>\r\n<tr align=\"center\">\r\n<td colspan=\"2\" width=\"346\">\r\n<p>Continuous Assessment<\/p>\r\n\r\n<p>40%<\/p>\r\n<\/td>\r\n<td colspan=\"7\" width=\"518\">\r\n<p>Final Assessment<\/p>\r\n\r\n<p>60%<\/p>\r\n<\/td>\r\n<\/tr>\r\n<tr>\r\n<td colspan=\"2\" width=\"346\">\r\n<p>Details:<\/p>\r\n<p>Assignments&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; 20%<\/p>\r\n<p>Quizzes&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;20%<\/p>\r\n<\/td>\r\n<td colspan=\"3\" width=\"170\">\r\n<p>Theory (%)<\/p>\r\n\r\n<p>60<\/p>\r\n<\/td>\r\n<td colspan=\"3\" width=\"182\">\r\n<p>Practical (%)<\/p>\r\n\r\n<p>-<\/p>\r\n<\/td>\r\n<td width=\"166\">\r\n<p>Other (%)<\/p>\r\n\r\n<p>-<\/p>\r\n<\/td>\r\n<\/tr>\r\n<tr>\r\n<td colspan=\"9\" width=\"864\">\r\n<p><strong>Recommended Reading<\/strong>:<\/p>\r\n<p>\u27a2&nbsp;&nbsp;&nbsp; McCaffer, H.R., Edum-Fotwe, F. (2013). <em>Modern Construction Management<\/em>, Wiley-Blackwell.<\/p>\r\n<p>\u27a2&nbsp;&nbsp;&nbsp; Arulanantham, J., &amp; Dissanayake, D. (2010). <em>Contract of Employment: cases and commentaries, <\/em>Law &amp; Society Trust.<\/p>\r\n<p>\u27a2&nbsp;&nbsp;&nbsp; Lawrence Bennett. (2003). <em>The management of Construction: A Project Life Cycle Approach<\/em>, Butterworth Heinemann.<\/p>\r\n<p>\u27a2&nbsp;&nbsp;&nbsp; Schexnayder, C.J., &amp; Mayo, R. (2003). <em>Construction Management Fundamentals, <\/em>McGraw-Hill.<\/p>\r\n<p>\u27a2&nbsp;&nbsp;&nbsp; CIDA Publications- ICTAD\/SBD\/01, 02,04, etc.<\/p>\r\n<\/td>\r\n<\/tr>\r\n<\/tbody>\r\n<\/table>\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t","protected":false},"excerpt":{"rendered":"<p>Semester: 7 Course Code: CE4030 Course Name: Construction Management Credit Value: 2 (Notional hours:100) Prerequisites: None Core\/Optional Core Hourly Breakdown Lecture hrs. Tutorial hrs. Practical hrs. Assignment hrs. Independent Learning &amp; Assessment hrs. 26 2 &#8211; 4 68 Course Aim: &hellip; <\/p>\n","protected":false},"author":1,"featured_media":0,"parent":0,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"footnotes":""},"class_list":["post-16626","page","type-page","status-publish","hentry"],"_links":{"self":[{"href":"https:\/\/eng.pdn.ac.lk\/civileng\/wp-json\/wp\/v2\/pages\/16626","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/eng.pdn.ac.lk\/civileng\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/eng.pdn.ac.lk\/civileng\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/eng.pdn.ac.lk\/civileng\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/eng.pdn.ac.lk\/civileng\/wp-json\/wp\/v2\/comments?post=16626"}],"version-history":[{"count":0,"href":"https:\/\/eng.pdn.ac.lk\/civileng\/wp-json\/wp\/v2\/pages\/16626\/revisions"}],"wp:attachment":[{"href":"https:\/\/eng.pdn.ac.lk\/civileng\/wp-json\/wp\/v2\/media?parent=16626"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}