meta data for this page
  •  

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

developments [2018/05/11 07:24]
developments [2020/01/20 20:03] (current)
Line 1: Line 1:
 +======Development Activities of EEU======
 +
 +  * 2018 Improving the web to provide educational resources to students
 +  * 2017-2018 Development of Alumni Management System
 +  * 2017-2018 Development of Document Archives for the Faculty
 +  * 2017-2018 Testing of Course Management System for the Faculty
 +  * 2017 Installing digital white board and tablet units in seminar room 1 and 2 (by E97 Batch)
 +  * 2017 Fixing Air Conditioning Units for Seminar for A/V Studio
 +  * 2017 Fixing Air Conditioning Units for Seminar Room 2
 +  * 2016 Purchasing an amplifier for pubic addressing system
 +  * 2016 Rewiring public addressing system by removing hanging wires
 +  * 2016 Installing speakers and wiring public addressing system for new corridor  ​
 +  * 2016 Installing a high intensity multimedia projector for the E.O.E.Pereira Theater
 +  * 2016 Installing multimedia projectors and screens for lecture rooms 13,​14,​15,​17.18.19,​20
 +  * 2015 Installing sound systems for lecture rooms 12,​13,​14,​15,​16,​17.18.19,​20,​21
 +  * 2015 Installing a high intensity multimedia projectors, two screens and sound system with wireless microphones for the Drawing Office 1
 +  * 2015 Purchasing three computers, two laptop and a printer, for seminar rooms and EEU office ​
 +  * 2016 Purchasing large whiteboards for seminar room 2 and 3
 +  * 2016 Establishing a new air conditioned conference room with digital white board (by E70?? batch)
 +  * 2015 Fixing illuminated “Lecture In Progress” sign boards for Seminar Rooms and Conference Room
 +  * 2015 Installing multimedia projectors for lecture room 5,6
 +  * 2015 Installing sound systems with wireless microphones for lecture room 3,4,5,6
 +  * 2015 Developing a resource reservation display system
 +  * 2015 Installing resource reservation system for reserving the seminar rooms,​conference room,  labs, lecture rooms and vehicles
 +  * 2015 Introducing calendar system for all the Departments of the Faculty
 +  * 2014 Improving the EEU Web site
 +  * 2014 Installing UPS for multimedia projectors of seminar rooms, conference room and E.O.E. Pereira Theater
 +  * 2014 Purchasing portable LED lighting system
 +  * 2014 Purchasing a Non-Liner Video Editing System
 +  * 2014 Purchasing Digital Video Camera with accessories